The informative office in the Ministry said that the company managed to re-operate the controlling system which was damaged because the main feeders “the Thirstier” of the fusion furnaces of the line were burned down as a result of the continuous and sudden severances of electricity.
The same source added that the company decided to maintain the line without the help of the supplying company through searching for local replacement of the damaged materials.
After locating the damages and training the cadres, specialized in operating and maintenance, by preparing studies and making special designs for this issue the controlling board was re-operated and its validity confirmed, and then was linked to the production line.(Source)Azzaman